Hi Rick,
Thanks for the confirmation on the variable epoch function and additional explanations on polort.
Following your suggestion, I got these durations of the events for all the anticipation conditions:
AntLoss.1D: min = 2, mean = 4, max = 6, stdev = 1.70561
AntMixed.1D: min = 2, mean = 4, max = 6, stdev = 1.70561
AntNeu.1D: min = 2, mean = 4, max = 6, stdev = 1.70561
AntReward.1D: min = 2, mean = 4, max = 6, stdev = 1.70561
Hope my selection of the variable epoch function is still appropriate given the range of the durations.
Sincerely,
Xi