Hi All
Hope you're doing well.
If I have a short dataset and I pull a timecourse out of it with:
xsim = THD_extract_series(ii,xset,0) ; xsar = MRI_FLOAT_PTR(xsim) ;
, does that mean that each of the individual timepoints in xsar has been multiplied by the float scaling factor that corresponds to the subbrik of the respective timepoint?
Thanks,
Prantik